Technical specification for burning machine 1.Two systems are required to be installed in the south of the Kingdom of Saudi Arabia. The two systems will be used by custom authority to burn different kinds of drugs. All need equipment must be provided. 2.Warrantee: booth systems must be provided with 3 years warrantee from the date of acceptance. All needed spare parts, preventative maintenance repair and corrective maintenance must be included in the cost and provided to the customer. 3.All needed electric and water connections must be provided. 4.Both systems must be of high quality and must be environmental friendly. 5.The capacity of each system should be up to 100 kg/hr. 6.The system must have automatic feeding. 7.Each system must consists of two burning rooms, one primary room for burning the drug and another room for burning the gases that emit as a result of primary burning. 8.The oven must be made of steel that is rust resistance and with thickness not less than 6 mm. 9.Each system must be of high efficient in burning different kinds of drugs, and should have 99.9% efficiency for burning organic materials. 10.Waste products should not exceed 5%. 11.System must have automatic ignition system. 12.System should use diesel (HSD) as fuel and should not consume more than 8 to 10 lt/hr . 13.Each system should be provided with fuel tank of size adequate to operate the system for one full day. 14.The temperature in the primary room should be 850 C ± 50 C. the system should also be capable to operate up to 1050 C ± 50 C. the system should be capable of continues operation and should be provided with cement layer insulator with adequate thickness. 15.Oven should be provided with heat insulator to allow easy operation. 16.Gas should remain in the secondary room for not more than 1.5 second.
Google快讯 – waste incinerator
waste incinerator 每天更新 ⋅ 2019年9月5日 新闻 Recycling 'may be burnt in waste incinerator' if no deal Brexit happens Gloucestershire Live Recycling such as plastic and paper may be burnt in Gloucestershire's waste incinerator if Britain leaves the European Union without a deal, a district … 标记为不相关 Relying on landfills is not an option The CT Mirror…
Google快讯 – waste incinerator
waste incinerator 每天更新 ⋅ 2019年9月4日 新闻 Potential landfill expansion would nearly double truck traffic in Boyertown The Mercury Earl and Berks get $2 for each ton of waste dumped in the landfill. … Rolling Hills is authorized to accept municipal solid waste, incinerator ash, … 标记为不相关 Korean firms promote 'eco-friendly' incinerator in PHL pna.gov.ph TACLOBAN CITY…
SPECIFICATIONS OF THE MEDICAL BIOLOGICAL WASTE INCINERATOR
SPECIFICATIONS OF THE MEDICAL/BIOLOGICAL WASTE INCINERATOR It should be a three chambered incinerator The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber. An Automatic bottom ashes discharge system.
Incinerator Spare part list
Spare part list – Ignition burner Item description N0 of required Motor 2 Control box 2 Pump couplings 4 Photo cells 2 Sets ht. leads 2 Sets electrodes 4 Oil valve 1 Nozzle 2 Spare part list – After burners Item description N0 of required Motor 2 Control box 2 Pump couplings 4 Photo cells 2 Sets ht. leads 2 Sets electrodes 4 Oil valve 1 Nozzle 2 Spare part list – Ram loader Item description N0 of required Reed switch 4 Seal kit 1 Medical waste incinerator Accessories – Clean out tools – Loading and ash removal methods. – Fuel storage tank with the two pump and all accessories. – Flue gas cleaning system – Stack discharge. – Medical waste incinerator civil work – Construct incinerator foundation – Provide stack support – Provide open steel structure room for the incinerator. Medical waste incinerator submittal shall include:- -Detail installation drawing – Incinerator and auxiliary product data – Test reports – Certificates like CE, ISO, LR, AFNOR, TUV and UL. – Energy analysis report – Project experience – Pollution control equipment emission rate. – Noise level limitation. – Quality assurance – Guarantee
MEDICAL/BIOLOGICAL WASTE INCINERATOR
SPECIFICATIONS OF THE MEDICAL/BIOLOGICAL WASTE INCINERATOR It should be a three chambered incinerator The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber. An Automatic bottom ashes discharge system.
U.S. EPA awards close to $8 million to protect and restore San Francisco Bay and its watersheds
CONTACT: Soledad Calvino (News Media Only) [email protected] 415-972-3512 FOR IMMEDIATE RELEASE September 3, 2019 U.S. EPA awards close to $8 million to protect and restore San Francisco Bay and its watersheds SAN FRANCISCO – The U.S. Environmental Protection Agency (EPA) has awarded almost $8 million in grants to protect and restore wetlands and streams in…
Spesifikasi Incinerator 200kg/jam
Spesifikasi Incinerator 200kg/jam Spesifikasi dan Daftar Material Dimensi dan Power Capacity Nama Barang : INCINERATOR Type / Model : PWR-INC-KMN 20 Kapasitas : 200kg/Jam (2 m3) Length : 384 cm Width : 182 cm Height : 213 cm Height of Chimney std : 700 cm TOTAL WEIGHT : 9.500 kg Panel – timer : Digital Included Auto Alarm Finishing : Hot endured paint Fuel tank : 200 Liter Covering Element from steel : 3-8mm Banyaknya Burner : 3 pcs Banyaknya Blower : 2 pcs Max. Fuel consumption : 15-40 Liter/Jam Max. Elektric consumption : 1300 Watt Bahan bakar : Kerosene / Diesel (solar) Voltage : 220 V / 1 phase / 50 Hz Material 1. PANEL CONTROL Type : Digital Buatan : Local KAMINE ( Panel dan Incinerator satu Merek) Voltage : 220 V / 1 phase / 50 Hz Safety operator : Emergency Stop System : Microkontroller Pengoperasian : Semi Automatic Temperatur control : Digital Coupler Type Control panel : Manual dan automatic Tipe : Self Standing Type / Wall Mounted Type Material : Mild steel Thermocontrol : 2 (Dua) 1200 ºC Set of timer : 0- 2 jam Tombol saklar…
complete with electric ignition and flame failure controls wired with continuous running fan
The waste will be reduced by 90~95% to leave 10 -5% ash 2.4 Quality/Environmental Standards NEMA ACT (EMCA) 1999 BS3316 2.5 Operating Period Anticipated daily operating period 8 hours Maximum operating period 12 hours 2.6 Chamber Should be refractory lined to the following standard; Hearth and lower section of chamber walls 2.7 Hot face material Super duty firebrick Limiting continuous service limit 1500°C Thickness 100mm Thermal conductivity 1.3 W/mk 2.8 Insulation Calcium silicate Limiting continuous service limit 1000°C Thickness 25mm Should be manufactured from refractory lined mild steel or high quality air-cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level. 2.10 Ignition Burners Fully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor. • Maximum rating: at least 450kW/hour • Burner: arranged for on/off operation • Maximum consumption: at least 6 litres/hour • Average consumption: at least 3 litres/hour…
a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner
The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective destruction of the combustion products. i. Waste type Health care waste ii. Waste density 125 to 350Kg/M3 iii.. Waste Calorific Value 4000 KCAL/Kg iv. Moisture content 10-25% v. Estimated ash residue 5-10% vi. Nominal capacity 50Kg/hour batch load vii. Secondary chamber 2 seconds @ 850°C The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel sections. It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate insulation and a hot face combination of super duty brickwork or high strength castable. The primary combustion chamber must ensure minimum exit temperature is not less than 850°C. One Manual Load Incinerator comprising: • Manual Loading door • Horizontal solid hearth, refractory lined primary combustion chamber. Approximate dimensions 800 mm diameters x 2100mm long • Full sized bulk load/ash removal door • 1 off diesel-fired ignition burner — temperature controlled • 1 off combustion air supply fan and distribution system, automatic control • High capacity secondary combustion chamber with residence time not less than 2 seconds @ >850°C • 1 off diesel-fired afterburner — temperature controlled …